Axisymmetric parts (cones, dishes, nozzles); low tooling, great for low-to-mid volume round shells.
PER-PART COST vs VOLUME
Per-part cost drops as volume spreads tooling and setup over more parts. The exact figures for your part at your volume, in your currency, are in the dossier.
MODEL EST.
$46 to 130per part at 1 off
A rough ballpark only. The dossier gives should-cost at your exact volume and currency, with the full breakdown.
GET THE FULL DOSSIER
Everything you need to quote and source it
The free route above is yours. To actually put a number on this process and buy it well:
Should-cost at your exact volume in 12 currencies, with the material, processing, tooling and overhead breakdown
Who to source from, typical MOQ and lead time, and the exact RFQ checklist to send
A quote checker that tells you if a supplier quote is fair, and the red flags to watch
SistematikWork is a whole IE platform. Past the free finder, there are 41 ready Excel calculators, templates and CAD guides, each built from real coursework and checked against known values.
Manufacturing & OperationsQuality & ReliabilitySupply ChainProject & StatisticsEngineering Career
Metal spinning forms a rotating disc over a mandrel with a roller or tool, flowing the metal into an axially symmetric shape. The typical route is: Blank; Spin; Trim; Anneal/finish; Inspect. Cones, domes, bells and dished heads at low to medium volume with low tooling cost.
What does Metal Spinning cost per part?
It depends on size, tolerance and volume. As a rough ballpark it starts around $46 to 130 per part at low volume and falls with quantity. The dossier gives should-cost at your exact volume and currency. Model estimates, not quotes.
What tolerance can Metal Spinning hold?
Typically about +/-0.3 mm, tighter with extra finishing operations at higher cost.
What materials suit Metal Spinning?
Common choices are Aluminium 1100/3003 (Spins easily); Stainless 304 (Corrosion, strong); Copper/brass (Decorative, thermal).
See the exact route and should-cost for your part
The free finder maps your part to its process and full route. Pro adds should-cost at your volume, sourcing and an RFQ draft.