Investment casting builds a wax pattern, coats it in a ceramic shell, melts the wax out, then pours metal into the cavity. It gives near-net shape with fine detail.
At a glance
When to use it, and when not
Best for
Complex, detailed metal parts needing a good finish and tight tolerances, including superalloys and turbine hardware.
Watch for
Higher part cost and longer lead time than sand casting, and size is limited by the shell.
Step by step
The typical route
Raw material to finished part. Steps vary with material, volume and tolerance; this is the free route from the finder.
Wax pattern
Injection-mould wax copies and assemble a tree.
Tooling Wax die Tolerance - Lead -
Shell build
Dip the tree in ceramic slurry and stucco, repeat, dry.
Tooling - Tolerance - Lead -
Dewax & pour
Flash-fire out the wax, then pour metal into the hot shell.
Tooling Furnace Tolerance - Lead -
Knockout & cut
Break the shell, cut parts off the tree, grind gates.
Tooling - Tolerance - Lead -
Finish & NDT
Machine where needed, FPI/X-ray critical parts.
Tooling CNC Tolerance - Lead -
Precision
Tolerances it can hold
TYPICAL TOLERANCE IT CAN HOLD
Where this process typically lands. Tighter is possible with extra operations like grinding, at higher cost.
Materials
Materials it suits
Grade
Why it suits this
Stainless 17-4PH / 316
Strong, corrosion resistant
Carbon/alloy steel
Strong, cheaper
Superalloy (Inconel)
High-temp
Design
Design tips
A few general pointers for Investment Casting. The full, part-specific DFM list is in the dossier.
Isolated heavy sections.Core out or add feeders.
Tight tolerance left as-cast.Add a machining stock face.
Cost
What it costs
Near-net and great finish, so it saves machining on complex parts; the wax die is the cost to amortise.
PER-PART COST vs VOLUME
Per-part cost drops as volume spreads tooling and setup over more parts. The exact figures for your part at your volume, in your currency, are in the dossier.
MODEL EST.
$460 to 785per part at 1 off
A rough ballpark only. The dossier gives should-cost at your exact volume and currency, with the full breakdown.
GET THE FULL DOSSIER
Everything you need to quote and source it
The free route above is yours. To actually put a number on this process and buy it well:
Should-cost at your exact volume in 12 currencies, with the material, processing, tooling and overhead breakdown
Who to source from, typical MOQ and lead time, and the exact RFQ checklist to send
A quote checker that tells you if a supplier quote is fair, and the red flags to watch
SistematikWork is a whole IE platform. Past the free finder, there are 41 ready Excel calculators, templates and CAD guides, each built from real coursework and checked against known values.
Manufacturing & OperationsQuality & ReliabilitySupply ChainProject & StatisticsEngineering Career
Investment casting builds a wax pattern, coats it in a ceramic shell, melts the wax out, then pours metal into the cavity. It gives near-net shape with fine detail. The typical route is: Wax pattern; Shell build; Dewax & pour; Knockout & cut; Finish & NDT. Complex, detailed metal parts needing a good finish and tight tolerances, including superalloys and turbine hardware.
What does Investment Casting cost per part?
It depends on size, tolerance and volume. As a rough ballpark it starts around $460 to 785 per part at low volume and falls with quantity. The dossier gives should-cost at your exact volume and currency. Model estimates, not quotes.
What tolerance can Investment Casting hold?
Typically about +/-0.2 mm, tighter with extra finishing operations at higher cost.
What materials suit Investment Casting?
Common choices are Stainless 17-4PH / 316 (Strong, corrosion resistant); Carbon/alloy steel (Strong, cheaper); Superalloy (Inconel) (High-temp).
See the exact route and should-cost for your part
The free finder maps your part to its process and full route. Pro adds should-cost at your volume, sourcing and an RFQ draft.