Primary process: Turning (Lathe). The full route, materials, tolerances and design tips for a bushing, with an indicative cost.
Turning (Lathe)Primary process
MachiningFamily
8Route steps
+/-0.025mmTypical tol.
A bushing is primarily made by Turning (Lathe). Turning spins the workpiece on a lathe while a single-point tool removes material, producing round features to tight tolerance. Below is the full route to make a bushing, the materials it suits, the tolerances to expect and the main design points. The route is free, from the finder.
Step by step
How a bushing is made
The usual route, raw material to finished part. The amber step is where the bushing gets its basic shape.
Stock
Start from bar, plate or billet sized for the bushing.
Turning (Lathe) (roughing)
Rough out the main shape, leaving stock on the critical surfaces.
Tooling None Tolerance ±0.025 to 0.125mm Lead 1 to 10 days
Finish machining
Take the finishing passes that bring the bushing to tolerance.
Tooling None Tolerance ±0.025 to 0.125mm Lead 1 to 10 days
Holes and features
Drill, ream and tap, and where needed broach splines or cut gear teeth.
Tooling None Tolerance ±0.05 to 0.2mm Lead hours to days
Heat treatment
Harden and temper if the bushing must resist wear or load, then finish-grind.
Tooling n/a Tolerance can distort Lead days
Grinding
Where the bushing has bearing or sealing surfaces, grind them to the tightest tolerance and finish.
Tooling Low (wheel) Tolerance ±0.002 to 0.02mm Lead days
Surface finish
Anodise, plate or coat for wear and corrosion resistance.
Tooling Low Tolerance adds microns Lead days
Inspection
Measure the bushing against the drawing, on a CMM for close work.
Need the real cost for a bushing? The free route above is yours. Unlock the full dossier to quote and source it.
Where this process typically lands. Tighter is possible with extra operations like grinding, at higher cost.
Materials
Materials for a bushing
Grade
Why it suits this
Bearing bronze (C932)
Self-lubricating, wear-resistant
C360 free-cutting brass
Best machinability, corrosion-resistant
Design
Design tips
General pointers. The full design-for-manufacturing list for a bushing is in the dossier.
Finished bore too tight.Leave stock for press-fit close-in.
Machined from solid.Start from bronze tube stock.
Cost
What a bushing should cost
Bronze cost and turning the bore/OD to fit.
PER-PART COST vs VOLUME
Per-part cost drops as volume spreads tooling and setup over more parts. The exact figures for a bushing at your volume, in your currency, are in the dossier.
MODEL EST.
$10 to 28per part at 1 off
A rough ballpark only. The dossier gives should-cost at your exact volume and currency, with the full breakdown.
GET THE FULL DOSSIER
Everything you need to quote and source it
The free route above is yours. To actually put a number on a bushing and buy it well:
Should-cost at your exact volume in 12 currencies, with the material, processing, tooling and overhead breakdown
Who to source from, typical MOQ and lead time, and the exact RFQ checklist to send
A quote checker that tells you if a supplier quote is fair, and the red flags to watch
SistematikWork is a whole IE platform. Past the free finder, there are 41 ready Excel calculators, templates and CAD guides, each built from real coursework and checked against known values.
Manufacturing & OperationsQuality & ReliabilitySupply ChainProject & StatisticsEngineering Career
A bushing is primarily made by turning (lathe). The route is: Stock; Turning (Lathe) (roughing); Finish machining; Holes and features; Heat treatment; Grinding; Surface finish; Inspection.
What does a bushing cost?
It depends on size, tolerance and volume. As a rough ballpark it starts around $10 to 28 per part at 1 off and falls with quantity. The dossier gives should-cost at your exact volume and currency. A model estimate, not a quote.
What material is a bushing made from?
Common choices are Bearing bronze (C932); C360 free-cutting brass.
What is the main process for a bushing?
Turning (Lathe). Shafts, pins, bushings, fittings and any round part, prototype to high volume on CNC.
See the exact route and should-cost for your part
The free finder maps your part to its process and full route. Pro adds should-cost at your volume, sourcing and an RFQ draft.